Grinding all the boards for the acoustic back really sucks.
The turtle head is in place and looks great and a bit folksy.
Marquis is in the works at least.
Front overhang copper installed.
Gold dome complete.
Lighting being considered.
Trash everywhere.
Stone to be laid.
3 benches needed.
2 support arms to be crafted for barge rafter support: Gold?
Chiminea with requisite stack desperately needed.
Text?
POWER?